Coastal Protection and Restoration Authority of Louisiana
Project Summary


 
      

Project Information:

    
State No: MR-03
Name: West Bay Sediment Diversion
Project Contact: Thomas Bernard
Acres Benefitted (if applicable):  9,831
Federal Sponsor (if applicable): Army Corps Of Engineers
 

Project Description:

The project consists of a conveyance channel for large-scaled uncontrolled diversion of freshwater and sediments from the Mississippi River. The diversion channel would be constructed in two phases: (1) Initial construction of an interim channel to accommodate a discharge of 20,000 cubic feet per second (cfs) at the 50% duration stages in the River and marsh development areas, and (2) Modification of the interim diversion channel design to accommodate full-scale diversion of 50,000 cfs at the 50% duration stage on the River after a period of intensive monitoring of diversion operations.
 
 

Project Location:

Parish(es):   Plaquemines
Senate District(s):   Senate District 1
Representative District(s):   Representative District 105
 
 

Additional Information:

 